with full-time experiment a personnel, be responsible for
All examinations in the construction process and calculate a work.The examination calculates instrument equipments centralized management, and hard work well a maintenance,
Maintain, periodical check.
6.3.6The strict pair of material quality closes.In addition to reinforcing bar, cement, brick, waterproof material etc. has to include a factory qualified certificate or the quality protect
Book;Materials, such as steel material, cement and brick...etc. have to press to request to carry on to two times send to kind to experiment, examining the qualified rear can use.Sand
The stone quality has to meet a norm request and forbid to use an unqualified sand, stone.
6.3.7Reserve bore and prepare to cover up piece at under construction have to press the design to request to detain to prepare to cover up, can not leave out.
6.3.8Have to compare to request to mix to make concrete, sand syrup
according to the norm and the match, start construction accurate calculate, strictly control water
The ash compares.It is strict to ask for creating concrete, sand syrup to try a piece according to the norm.
6.3.9Sprinkle a Dao concrete front, should to the stalk line, elevation, template, prop up, reinforcing bar etc. carry on a quality check, qualified The rear can start sprinkling to build.
6.3.10Returning to fill soil have to the layering is once popular solid, return to fill soil thickness in the 20 cms~the 30 cm is or so, and should carry on a time Fill an airtight solid degree of soil examination.
6.3.11Sprinkle proper use at first and strached(with the concrete match with ratio go to stone of sand syrup) first joint before building new concrete, the thickness should not be super
Lead 50 mms.
6.3.12Window sill, and toilet...etc. request to press to request to stay a slope the ground of the place of flowing water slope, and notice to flow
Water direction.
6.3.13The concrete flaps Dao should airtight solid, can not leak to flap, avoid
appearing the beehive hemp noodles phenomenon, sprinkle Dao over concrete should
There is specially assigned that protect, protecting time doesn't should be less than a 7 ds, the waterproof concrete protects to be no less than 14 ds.
6.3.14It is strict to request to detain a construction to sew according to the norm, ensure structure engineering quality.
6.3.15Carve to build sand syrup should full, and control sand syrup thickness, especially northern side, should strictly according to skin count the pole carve to build,
Check at any time, don't weigh to sew, not deeply bright, in order to prevent ooze water.
6.3.16Strictly forbid to do brick a top wall.The air temperature normal
opportune moment brick uses ex- should advance a 4~12 hs to water moist, the weather is blazing hot
, Should also water again at the time moist.
6.3.17Strengthen water to give or get an electric shock a warm the gearing and soil set up the close match of construction and press to request to lay water electric wire tube, can not at will
Dig a wall to beat hole.
6.3.18Frame pillar and brick wall pull to knot Jin to leak to put, covering up into the length inside the wall should press the design request, norm request, And be no less than 500;Reinforcing bar's carrying a head should bend to hang up.
6.3.19Cement sand syrup's painting should see an air temperature height and sprinkle water moist basic appropriately, and protect the cement sand syrup noodles.
6.3.20Inside the outside could not pollute a window frame while
decorating(paint), should wipe the sand syrup of the pollution window frame in time clean.
6.3.21Decorating the engineering construction should strictly carry on
according to the relevant work method, a little bit deluxely repairing should do a sample product first, through each
The department concerned checks and accepts qualified rear to carry on a big area construction, more deluxe adornment should choose technique level high profession
Operate a personnel to carry on a construction, decorating to start construction the stage should strictly protect regulation to work well a finished product protection work according to the product.
6.3.22Is under construction to work well each quality to record and tidy up into volume.
6.4The this engineering main item quality control procedure sees attach table 8.
6.5Winter rain starts construction in summer measure
6.5.1The winter expects the technique measure of starting construction
The technical personnel of engineering item department should acquaint with to design diagram paper and understand a work project in time and control a weather variety circumstance,
According to the characteristics of each engineering and each stage, write a detailed winter to expect the project of starting construction in time.For working well this work, according to
This engineering characteristics and work period, the winter expects to start construction to mainly adopt following technique measure:
1.When the winter expects to start construction, concrete of agitation time should prolong appropriately and transport time to shorten as far as possible and promise to mix
The going into of Ning soil mold temperature.The concrete after sprinkling well overalies heat preservation to protect with the thin film and grass bag etc. in time.
2.carve to build sand syrup should attain with mix with use, can not have a congelation phenomenon, add antifreeze in response to the appropriate Chan under negative Wen Qing Kuang.
3.the wall body should overaly a heat preservation after finishing carving, in order to prevent be subjected to a jelly.
4.soil when the square return to fill should notice to prevent°from appearing to freeze a soil phenomenon.
5.outward the dew tube beard heat preservation colligation, any machine with water, after getting off work should put water empty, so as not to freeze bad establish
Have.
6.work well the spot draining, the clear covered sewerage should keep
unimpeded.
7.Get into a winter to expect before starting construction, to Chan in addition personnel, measure personnel's etc. should carry on a specialized
organization technique industry
Work a training, through examine qualified rear quasi- top Gang.
8.the arrangement specially assigned carry on air temperature to
prognosticate and make a record.With be located in a meteorological station station to keep in touch, receive a sky in time
Spirit forecast, keep cold current of air from assaulting suddenly.
9.any carries on the engineering item that the winter expects to start
construction to recheck to start construction diagram paper, check as to it's whether can adapt to a winter to expect
The work requests.
10.temporary water supply piping and relevant material of workplace work well a heat preservation work.
11.Have to sweep the accumulated snow on the shelf clean after the heavy snow, and check aisle platform, if is loose to move next sink a phenomenon, Must handle in time.
6.5.2Rain expects the main technique measure of starting construction
What engineering rain expects to start construction main consideration is the exclusion of the spot rain water, the emissions outlet of rain water
GenerationGapWhenyougoshoppingwithyourmotheryoumayfindadressreallygorgeousw…
GenerationgapGenerationgapisacommonprobleminmodernsocietyItiscausedbymanyan…
GenerationGapNoonecouldhavefailedtonoticethattherelationshipbetweenparentsa…
GenerationGapNowadaysthereisoftenalackofunderstandingbetweenparentsandchild…
CausesoftheGenerationGapThegenerationgaphasbeenanancientissueBothparentsand…
四按要求写出你平时积累的格言警句名言谚语1珍惜时间的A百川东到海何时复西归少壮不努力老大徒伤悲汉乐府长歌行B宝剑锋从磨砺出梅花香自…
20xx申论写作备考名言警句应用范例一在事业单位申论考试中经典的名言警句明确含义了解适用范围才能真正为申论写作锦上添花下面列举部分…
20xx届高考第一轮复习第12讲名言名句默写训练题北京市西城区20xx届下学期高三年级一模考试语文试卷在横线处写出诗文的原句限选做…
我最喜欢的一句格言读一本好书就像和许多高尚的人谈话的确读一本好书可以让人增长知识开阔眼界使人的境界更高一层但在很多同学眼里读书却像…
以孔子或名字的某一句名言为题写一篇议论文作文指导一指导学生审清题意1出示要求以孔子或名字的某一句名言为题写一篇议论文内容不限题目自…